Description
Data or tool parameters were provided that will result in a cube structure with more than 2 billion bins.
Solution
Increase the duration for the Time Step Interval parameter or increase the Distance Interval parameter value.
Data or tool parameters were provided that will result in a cube structure with more than 2 billion bins.
Increase the duration for the Time Step Interval parameter or increase the Distance Interval parameter value.