Event behavior for cartographic realignment

Location Referencing ライセンスで利用可能です。

Cartographic realignment is the method of updating route geometry based on aerial imagery, as-built drawings, or input from field data collectors in a manner that does not change its measures. This can be achieved by direct modifications to the centerline that is associated with the route.

Learn more about applying cartographic realignment

注意:

Events are not updated until the Apply Event Behaviors geoprocessing tool is applied after route edits. If you are using conflict prevention, you are prompted to run Apply Event Behaviors, which must be done before posting can be completed.

The following sections detail the results of executing this tool on event features.

Cartographic realignment scenario

When cartographic realignment occurs, events are impacted, depending on the configured event behavior for each event layer. The following are the results of executing the Apply Event Behaviors geoprocessing tool on event features.

Before cartographic realignment

Honor Route Measure behavior

The geographic location and the measures of the event change to that of the resultant cartographically realigned route, and the route and the event always remain in sync. Since the route is not time-sliced, the event is also not time-sliced because of this operation.

After cartographic realignment

When performing a cartographic realignment, you may choose the Honor Route Measure rule.

BehaviorDescription

Honor Route Measure

Preserves the measure of the event

注意:

Point events follow the same behavior as linear events.

Detailed behavior results

The following section details how event behavior rules are enforced when a route is cartographically realigned.

Honor Route Measure behavior

The Honor Route Measure rule either preserves the measure of the event or changes the measure proportionally to the route's measure change.

Before cartographic realignment

Route IDFrom dateTo dateLine name

Route1

1/1/2000

<null>

East Line

Event IDRoute IDFrom dateTo dateFrom measureTo measure

Event1

Route1

1/1/2000

<null>

0

10

After cartographic realignment