Location Referencing ライセンスで利用可能です。
ルートが廃止されると、イベントが、各イベント レイヤーに対して構成されたイベントの振舞いに応じて影響を受けます。
注意:
Events are not updated until the Apply Event Behaviors tool is applied after route edits. If you are using conflict prevention, you are prompted to run Apply Event Behaviors before posting can be completed.
注意:
When recalibrate downstream is chosen for an LRS route edit, the configured calibrate event behavior is applied to downstream sections.
The following sections detail the results of executing the Apply Event Behaviors tool on event features after a corresponding route edit.
Route retirement scenario
The following retirement scenario involves one route and three events. The retirement (depicted with a dashed line) starts in Event1, completely spans Event2, and ends in Event3.
Stay Put behavior
The geographic location of the event outside of the retire region is preserved; the measures can change. The event can also split if it crosses the retire region. Portions of the reassign region are retired.
Move behavior
The measures and route of the event are maintained; the geographic location can change.
Retire behavior
The geographic location and measure of the event are preserved; the event is retired. Events intersecting the retire region are retired.
Upstream and downstream sections
Route editing impacts upstream and downstream sections differently.
The following diagram shows the upstream and downstream sections for the route retirement scenario:
The following table details how the retirement editing activity impacts upstream and downstream events according to the configured event behavior:
Behavior | Events upstream | Events intersecting | Events downstream |
---|---|---|---|
Stay Put | No action. | Retire event; line events crossing the edit region are split and the original event retired. | If route calibration is changed, the recalibrate event behavior is applied; otherwise, no action. |
Move | Shape regenerated, if needed, to new location of route measures. | Shape regenerated to new location of route measures. | If route calibration is changed, the recalibrate event behavior is applied; otherwise, no action. |
Retire | No action. | Retire event; line events crossing edit region are not split. | If route calibration is changed, the recalibrate event behavior is applied; otherwise, no action. |
注意:
- Point events follow the same behavior as line events but don't need to be split.
- If the Recalibrate route downstream option is chosen, calibrate route event behaviors are applied to the events downstream of the edited portion of the route.
- The network can contain events that span multiple routes in a line network. In this case, the behaviors are still applied in the same manner.
- Since the LRS is time aware, edit activities—such as retiring a route—time slice routes and events.
Detailed behavior results
The following sections detail how event behavior rules are enforced when a route is retired.
Stay Put behavior
The route is active from 1/1/2000, and if the retirement is set to occur on 1/1/2005 and Recalibrate route downstream is not chosen, this has the following effects:
- Event1 is represented by two time slices. There is a time slice from 1/1/2000 to 1/1/2005, with the original measures from 0 to 20, and a time slice from 1/1/2005 to <Null>, with measures from 0 to 15, that stay the same location geographically.
- Event2 retires to maintain geographic location.
- Event3 is represented by two time slices. There is a time slice from 1/1/2000 to 1/1/2005, with the original measures from 30 to 45, and a time slice from 1/1/2005 to <Null>, with measures from 35 to 45, that stay the same geographically.
Before Stay Put event behavior
The following diagram provides details about the route before retirement:
The following table provides details about the events before retirement:
Event | Route Name | From Date | To Date | From Measure | To Measure |
---|---|---|---|---|---|
Event1 | Route1 | 1/1/2000 | <Null> | 0 | 20 |
Event2 | Route1 | 1/1/2000 | <Null> | 20 | 30 |
Event3 | Route1 | 1/1/2000 | <Null> | 30 | 45 |
After Stay Put event behavior
The following diagram provides details about the route after retirement:
The following table provides details about the events after retirement when Stay Put is the configured event behavior:
Event | Route Name | From Date | To Date | From Measure | To Measure | Location Error |
---|---|---|---|---|---|---|
Event1 | Route1 | 1/1/2000 | 1/1/2005 | 0 | 20 | No Error |
Event1 | Route1 | 1/1/2005 | <Null> | 0 | 15 | No Error |
Event3 | Route1 | 1/1/2000 | 1/1/2005 | 30 | 45 | No Error |
Event3 | Route1 | 1/1/2005 | <Null> | 35 | 45 | No Error |
Move behavior
The route is active from 1/1/2000, and if the retirement is set to occur on 1/1/2005 and Recalibrate route downstream is not chosen, this has the following effects:
- Event1 is represented by two time slices. There is a time slice from 1/1/2000 to 1/1/2005 and a time slice from 1/1/2005 to <Null>, both with the original measures from 0 to 20. This new time slice will only partially locate since the event time slice has measures from 0 to 20, but the underlying route time slice only has measures from 0 to 15 and 35 to 55, with a physical gap created due to retirement.
- Event2 is represented by two time slices. There is a time slice from 1/1/2000 to 1/1/2005 and a time slice from 1/1/2005 to <Null>, both with the measures from 20 to 30. This new time slice will not locate since the event time slice has measures from 20 to 30, but the underlying route does not have a route with those measures.
- Event3 is represented by two time slices. There is a time slice from 1/1/2000 to 1/1/2005 and a time slice from 1/1/2005 to <Null>, both with the original measures 30 to 45. This new time slice only partially locates since the event time slice has measures from 30 to 45, but the underlying route time slice only has measures from 0 to 15 and 35 to 55, with a physical gap created due to retirement.
Before Move event behavior
The following diagram provides details about the route before retirement:
The following table provides details about the events before retirement:
Event | Route Name | From Date | To Date | From Measure | To Measure |
---|---|---|---|---|---|
Event1 | Route1 | 1/1/2000 | <Null> | 0 | 20 |
Event2 | Route1 | 1/1/2000 | <Null> | 20 | 30 |
Event3 | Route1 | 1/1/2000 | <Null> | 30 | 45 |
After Move event behavior
The following diagram provides details about the route after retirement:
The following table provides details about the events after retirement when Move is the configured event behavior:
Event | Route Name | From Date | To Date | From Measure | To Measure | Location Error |
---|---|---|---|---|---|---|
Event1 | Route1 | 1/1/2000 | 1/1/2005 | 0 | 20 | No Error |
Event1 | Route1 | 1/1/2005 | <Null> | 0 | 20 | Partial match for the To measure |
Event3 | Route1 | 1/1/2000 | 1/1/2005 | 30 | 45 | No Error |
Event3 | Route1 | 1/1/2005 | <Null> | 30 | 45 | Partial match for the From measure |
Retire behavior
The route is active from 1/1/2000, and if the retirement is set to occur on 1/1/2005 and Recalibrate route downstream is not chosen, this has the following effects:
- Event1 retires since it intersects the retired region.
- Event2 retires since it is completely inside the retired region.
- Event3 retires since it intersects the retired region.
Before Retire event behavior
The following diagram provides details about the route before retirement:
The following table provides details about the events before retirement:
Event | Route Name | From Date | To Date | From Measure | To Measure |
---|---|---|---|---|---|
Event1 | Route1 | 1/1/2000 | <Null> | 0 | 20 |
Event2 | Route1 | 1/1/2000 | <Null> | 20 | 30 |
Event3 | Route1 | 1/1/2000 | <Null> | 30 | 45 |
After Retire event behavior
The following diagram provides details about the route after retirement:
The following table provides details about the events after retirement when Retire is the configured event behavior:
Event | Route Name | From Date | To Date | From Measure | To Measure | Location Error |
---|---|---|---|---|---|---|
Event1 | Route1 | 1/1/2000 | 1/1/2005 | 0 | 20 | No Error |
Event2 | Route1 | 1/1/2000 | 1/1/2005 | 20 | 30 | No Error |
Event3 | Route1 | 1/1/2000 | 1/1/2005 | 30 | 45 | No Error |
ルートにスパンするイベントを持つライン ネットワークのルートの詳細な動作
維持 (Stay Put) の振舞い
この廃止シナリオには、ライン ネットワーク内のライン上の 4 つのルートと、2 つのイベントがあります。 Route3 が廃止されます。 廃止されるルート (点線で表示) は、Event1 と Event2 に影響を与えます。
ルートが 1/1/2000 にアクティブになって 1/1/2005 に廃止されるよう設定され、[ルート下流部分の再キャリブレーション] がオフの場合、次の影響があります。
- Event1 は、2 つのタイム スライスで表されます。 Route1 と Route3 に元のメジャー値 0 〜 30 を含む 1/1/2000 から 1/1/2005 までのタイム スライスと、Route1 のメジャー値 1 から Route2 のメジャー値 22 を含む、地理的に同じ場所にある 1/1/2005 から <NULL> までのタイム スライスができます。 Route3 のイベントの一部は、イベント シェープのその部分を構築するルートがなくなったため、廃止されます。
- Event2 は、2 つのタイム スライスで表されます。 Route3 の元のメジャー値 30 から Route4 の元のメジャー値 48 を含む 1/1/2000 から 1/1/2005 までのタイム スライスと、Route4 のメジャー値 38 から Route4 のメジャー値 48 を含む、地理的に同じ場所にある 1/1/2005 から <NULL> までのタイム スライスができます。 Route3 のイベントの一部は、イベント シェープのその部分を構築するルートがなくなったため、廃止されます。
維持 (Stay Put) イベントの振舞いの前
The following table provides details about the events before retirement:
イベント ID | 開始日 | 終了日 | 始点ルート ID | 終点ルート ID | 始点メジャー | 終点メジャー | |
---|---|---|---|---|---|---|---|
Event1 | 1/1/2000 | <NULL> | Route1 | Route3 | 0 | 30 | |
Event2 | 1/1/2000 | <NULL> | Route3 | Route4 | 30 | 48 |
維持 (Stay Put) イベントの振舞いの後
The following diagram provides details about the route after retirement:
イベント ID | 開始日 | 終了日 | 始点ルート ID | 終点ルート ID | 始点メジャー | 終点メジャー | ロケーション エラー |
---|---|---|---|---|---|---|---|
Event1 | 1/1/2000 | 1/1/2005 | Route1 | Route3 | 0 | 30 | エラーなし |
Event1 | 1/1/2005 | <NULL> | Route1 | Route2 | 0 | 22 | エラーなし |
Event2 | 1/1/2000 | 1/1/2005 | Route3 | Route4 | 30 | 48 | エラーなし |
Event2 | 1/1/2005 | <NULL> | Route4 | Route4 | 38 | 48 | エラーなし |
移動 (Move) の振舞い
ルートが 1/1/2000 にアクティブになって 1/1/2005 に廃止されるよう設定され、[ルート下流部分の再キャリブレーション] がオフの場合、次の影響があります。
- Event1 は、2 つのタイム スライスで表されます。 いずれも Route1 の元のメジャー値 0 から Route3 の元のメジャー値 30 を含む、1/1/2000 から 1/1/2005 までのタイム スライスと 1/1/2005 から <NULL> までのタイム スライスができます。 この新しいタイム スライスは、イベントのタイム スライスが Route1 のメジャー値 30 から Route3 におよんでいるので、一部のみが配置されますが、Route3 は廃止されたので、その場所にはシェープを構築するルートがありません。
- Event2 は、2 つのタイム スライスで表されます。 いずれも Route3 のメジャー値 30 から Route4 のメジャー値 48 を含む、1/1/2000 から 1/1/2005 までのタイム スライスと 1/1/2005 から <NULL> までのタイム スライスができます。 この新しいタイム スライスは、イベントのタイム スライスが Route3 のメジャー値 30 ~ 48 から Route4 におよんでいるので、配置されません、Route3 は廃止されたので、その場所にはシェープを構築するルートがありません。
移動 (Move) イベントの振舞いの前
The following table provides details about the events before retirement:
イベント ID | 開始日 | 終了日 | 始点ルート ID | 終点ルート ID | 始点メジャー | 終点メジャー |
---|---|---|---|---|---|---|
Event1 | 1/1/2000 | <NULL> | Route1 | Route3 | 0 | 30 |
Event2 | 1/1/2000 | <NULL> | Route3 | Route4 | 30 | 48 |
移動 (Move) イベントの振舞いの後
The following diagram provides details about the route after retirement:
イベント ID | 開始日 | 終了日 | 始点ルート ID | 終点ルート ID | 始点メジャー | 終点メジャー | ロケーション エラー |
---|---|---|---|---|---|---|---|
Event1 | 1/1/2000 | 1/1/2005 | Route1 | Route3 | 0 | 30 | エラーなし |
Event1 | 1/1/2005 | <NULL> | Route1 | Route3 | 0 | 30 | 終点メジャーとの部分一致 |
Event2 | 1/1/2000 | 1/1/2005 | Route3 | Route4 | 30 | 48 | エラーなし |
Event2 | 1/1/2005 | <NULL> | Route3 | Route4 | 30 | 48 | 始点メジャーとの部分一致 |
廃止 (Retire) の振舞い
ルートが 1/1/2000 にアクティブになって 1/1/2005 に廃止されるよう設定され、[ルート下流部分の再キャリブレーション] がオフの場合、次の影響があります。
- Event1 は、廃止された領域内にあるので、廃止されます。
- Event2 は、廃止された領域内にあるので、廃止されます。
廃止 (Retire) イベントの振舞いの前
The following table provides details about the events before retirement:
イベント ID | 開始日 | 終了日 | 始点ルート ID | 終点ルート ID | 始点メジャー | 終点メジャー |
---|---|---|---|---|---|---|
Event1 | 1/1/2000 | <NULL> | Route1 | Route3 | 0 | 30 |
Event2 | 1/1/2000 | <NULL> | Route3 | Route4 | 30 | 48 |
廃止 (Retire) イベントの振舞いの後
The following diagram provides details about the route after retirement:
次の図および表では、属性テーブルにレコードを持たない 2 つのイベントが廃止されます。
イベント ID | 開始日 | 終了日 | 始点ルート ID | 終点ルート ID | 始点メジャー | 終点メジャー | ロケーション エラー |
---|---|---|---|---|---|---|---|
Event1 | 1/1/2000 | 1/1/2005 | Route1 | Route3 | 0 | 30 | エラーなし |
Event2 | 1/1/2000 | 1/1/2005 | Route3 | Route4 | 30 | 48 | エラーなし |